CNC Plasma Machines

Moving a machine over December

December shutdown can be the best time to move a plasma machine or install one at a new site. With the workshop quiet, we can plan the relocation properly, prepare the floor and power, then come back in January to level the machine and run test cuts.

CNC plasma machine on a pallet in a workshop with tools and cable trays nearby

Book the move early

December bookings fill quickly because many workshops want the same shutdown window. If we know your target dates early, we can plan the collection, transport, offloading and re-installation around your production break.

We also use that lead time to confirm what the machine needs at the new site, from fork access and lifting gear to table size, gantry clearance and where the controller and gas gear will sit.

Prepare the new floor

A clean, level floor makes the first week back far easier. Before the machine arrives, the base area should be swept, checked for cracks or soft spots, and left with enough working space around the table for loading plate, maintenance and cut part handling.

It helps to mark the final position before the machine comes in, then check access routes for doors, ramps and corners. If the new site is tight, we plan the move methodically so the table lands where it should, not where it is easiest to drop it.

  • Clear the final machine bay and nearby walkways
  • Check floor level and surface strength
  • Allow space for plate loading and offcuts
  • Plan access for lifting and transport equipment

Check the power before January

Power is one of the most common causes of a delayed restart. We look at the supply, isolator position, cabling route, earthing and whether the installation matches the machine and its plasma source, extraction and compressor needs.

If there is an old installation to remove, it is better to sort that before the new table arrives. Clean cable runs, labelled isolators and a tidy control area save time when the workshop wants to start cutting again after the holidays.

Re-level and align the table

After transport, a machine should not be assumed to still be true. We re-level the base, check the rails and drive components, inspect the torch height system and confirm that the table is square and stable before any production cuts start.

This is also the right time to look at wear items, missing fasteners, hoses, filters and consumables. If a part has been sitting unused or has travelled in the move, we want to catch it before the first job of the year.

  • Level the frame and confirm the table sits evenly
  • Inspect rails, drives and torch height control
  • Check hoses, cables and consumables for damage
  • Confirm all guards and safety parts are back in place

Start January with test cuts

We prefer to restart with test cuts, not a full production order. That gives us a clean way to confirm cut quality, pierce consistency, kerf width, speed settings and whether the machine is tracking correctly after the move.

If you are planning a move, a swap or a fresh install, it is worth linking the relocation with a service visit and a spares check. See our relocation page for move support and our inspection and warranty page for what we check before handover. You can also use our contact form to book the shutdown window.

Questions we get asked

When should we book a December relocation?

As early as possible, especially if you want the machine moved before the shutdown starts. Early booking gives us time to plan access, power and re-installation properly.

Can the machine be moved and installed after Christmas?

Yes, if the workshop is ready and access is available. January is often the best time for re-levelling, test cuts and any final adjustments.

What should we prepare before the machine arrives?

Have the floor cleared, the power supply checked and the final position marked out. It also helps to leave space for loading, maintenance and the control area.